    25 June 2012, Volume 34 Issue 6
    专题综述
    Experimental analysis on blended burning of multiple kinds of coal in 630MW supercritical boiler
    CAI Xiao;WANG Xiaojun
    2012, 34(6):  1-4. 
    Asbtract ( 857 )  
    Related Articles | Metrics
    In the 630MW supercritical boiler of a power plant, the multiple kinds of coal produced in Indonesia, Guizhou Province of China, Columbia, Australia and South Africa were blended and burned. The features of the blended burning of multiple coal grades were analyzed. The ratio of each kind coal in the coal as fired and the blending mode were expounded, and the matters needing attention in blending of multiple kinds of coal were pointed out. The experience of the plant in blended burning of multiple kinds of coal can be used as reference for similar power plants.
    Optimization of operation condition of chemical water system in 660MW ultra supercritical unit
    WANG Guorong
    2012, 34(6):  5-8. 
    Asbtract ( 735 )  
    Related Articles | Metrics
    There are some problems existing in operation of ultra supercritical unit, which include that the cleanness of watersteam is poor, the scaling speed is higher, the pressure difference of the boiler increases faster and others. The factors influencing on corrosion and scaling of the unit were analyzed. The operation condition of chemical water system was optimized with certain aim. The unit feed water treatment mode had been changed from the reducing fullvolatile treatment mode with adding ammonia and hydrazine to the oxidizing fullvolatile treatment mode with adding only ammonia, which can eliminate some negative influences partly and is helpful for safe and economical operation of the unit.
    Optimization of full process automatic control strategy for air cooling island of 600MW direct aircooled unit
    LI Jiadong;WANG Luchun;QU Tao;HUO Minyan
    2012, 34(6):  9-10. 
    Asbtract ( 966 )  
    Related Articles | Metrics
    The full process automatic control scheme of cooling island of 2×600MW direct aircooled unit in Huaneng Tongchuan Power Plant was introduced. The existed problems were analyzed, and the control system was optimized. The optimized air cooling system obtained favorable energysaving effects and provides reference for optimization of similar units.
    Reason analysis and preventive measures of highpressure heater leakage of 600MW unit
    GUAN Jirong
    2012, 34(6):  11-12. 
    Asbtract ( 973 )  
    Related Articles | Metrics
    The first leakage of highpressure heater No.2 of unit No.1 in Guangdong Yudean Jinghai Power Generation Company Limited was introduced. The reasons of the leakage fault were analyzed. The relevant preventive measures were formulated, and the matters needing attention in the fault treating process were pointed out. The results of this paper provide certain reference for operation and maintenance of highpressure heaters of power plants.
    研究与开发
    Matching optimization of between air separation unit and gas turbine in IGCC system
    ZHANG Dongxiao;CHEN Xiaoli;;WU Shaohua;LI Zhenzhong
    2012, 34(6):  13-15. 
    Asbtract ( 932 )  
    Related Articles | Metrics
    The model of integrated gasification combined cycle (IGCC) was established by ThermoFlex software. The influences of air separation unit integrated coefficient (Xas) and nitrogen reinjection coefficient (Xgn) on the system performance were studied in detail under the different ASU pressures. The results show that the net efficiency of IGCC system increases as the increase of Xas at the high ASU pressure, but the net efficiency decreases as the increase of Xas at the low ASU pressure. Low ASU pressure is not suitable at Xas=0. As Xgn increasing, the net efficiency of IGCC system increases firstly and then decreases both at the high and low ASU pressure. The gas turbine emissions requirement on NOx can be satisfied when the low Xgn and ASU pressure are applied.
    Study on layout of water filtering equipments of pumping station for coastal power plants
    ZHOU Baowei;ZHOU Jinquan
    2012, 34(6):  16-21. 
    Asbtract ( 715 )  
    Related Articles | Metrics
    The water filtering equipments are important part of pumping station in coastal nuclear power plants and fossil fuel power plants, which relate to the safe operation of the boost pump, the conventional island turbine condenser and the nuclear island heat exchangers. The water filtering equipments of pumping station include the coarse and fine grilles, the grille cleaner, the frame filtering screen, the rotating drum filtering screen and others. These equipments can be selected according to the comprehensive analysis of the materials about the water consumption, the tidal level, the sediment concentration, the tree branches and weeds, the all kinds of suspended matter and the marine organisms and referring to the operation of similar coastal power plants. The rotating drum filtering screen was researched and discussed emphatically; the domestic and foreign water filtering equipments were analyzed and compared; and the design key points of water filtering equipments of pumping station of the coastal power plants were summarized.
    Comparative analysis on drytype and wettype deslagging system for large size coalfired boiler
    YUE Xinxi
    2012, 34(6):  22-24. 
    Asbtract ( 1103 )  
    Related Articles | Metrics
    The paper introduces aircooled drytype deslagging system applied more in large size power plant boiler in recent years. Comparative tests on drytype and wettype deslagging system were done. By contrasting boiler exhaust gas temperature, combustible ash content and boiler efficiency, the effect of drytype deslagging system on boiler is given, and this provides a reference for deslagging system choice in large unit.
    Analysis on second lawbased equivalent power generation efficiency for CCPH power plant
    WU Wenjie;LI Kun
    2012, 34(6):  25-29. 
    Asbtract ( 1065 )  
    Related Articles | Metrics
    The gassteam combined cycle cooling heating and power supply system (CCHP) has higher energy utilization and is used widely. However, there is not universal objective definition of the efficiency for CCHP plant at present. A concept of second lawbased equivalent power generation efficiency for CCHP plant was proposed based on the second thermodynamic law, which can be used to evaluate the system efficiency of different grade energies. Combining with examples of several power plants, the differences between several efficiency definitions were compared. The results can be used as reference for design and technical improvement of CCHP plant.
    Analysis about influence of steel ball amount loaded in mill on pulverizing system of unit
    CONG Xiaorong;ZHANG Zhigang;ZHANG Xiangyu;YIN Minquan
    2012, 34(6):  30-32. 
    Asbtract ( 1038 )  
    Related Articles | Metrics
    In order to reduce the house service consumption rate of a power plant and to increase the reliability of the coal mill, combining with the experiences of other power plants, the operation of the coal mill was analyzed; and the influences of the optimal steel ball amount loaded in coal mill on the pulverizing system of the unit were expounded. By adjustment of the steel ball amount loaded in the coal mill, the power consumption of the unit was reduced, and the economical efficiency of the unit operation was improved.
    Analysis on bending reasons of high and medium pressure rotors of steam turbine
    WANG Jiebin;YANG Feng
    2012, 34(6):  33-36. 
    Asbtract ( 1162 )  
    Related Articles | Metrics

    The processes of unit startingup and the high and medium pressure rotors bending accident were introduced. The vibration was measured on the site. The reasons of the bending accident of high and medium pressure rotors of turbine No.14 in a power generation company were analyzed. According to the preliminary judgment, the reasons of the bending accident of high and medium pressure rotors are that the mechanical properties of the high and medium pressure rotors are unstable, the local dynamic/static clearance is decreased due to long term operation of the unit, the control of the steam temperature and pressure in the steam sealing system is irrational, the rolling decision after tripping is incorrect, that is to roll the turbine as soon as the turbine shut down and do not turn the turbine sufficiently to release the bending caused by the heat stress, which is against the rule of the file ‘25 Key Requirements to Prevent Serious Accident in Power Production’, and so on.

    研究与开发
    Study on forecasting model of boiler slagging characteristics
    ZHAO Ningning;RONG Lingyu
    2012, 34(6):  37-40. 
    Asbtract ( 755 )  
    Related Articles | Metrics
    The factors influencing on slagging of power station boiler were analyzed. The indexes for judging the slagging tendency of boiler were determined. The platform of forecasting and judging system was designed. Using the platform, various indexes and algorisms were studied and compared. Combining the fuzzy mathematics with the BP network, the judging model of fuzzy neural network was established. Using the judging model, the slagging of the asfired coal grade of the units in Shanxi Datang International Yungang Thermal Power Company Limited was forecasted, and favorable effects were obtained.
    Research on explosion fatalness of long flame coal in middle storage type ball mill
    MA Zhiming
    2012, 34(6):  41-43. 
    Asbtract ( 808 )  
    Related Articles | Metrics
    The quality indexes of the Huaibeiproduced long flame coal and the quality indexes of the coal commonly used in power plants are almost the same; and the Huaibeiproduced long flame coal has good combustion economic efficiency. However, in practical use, if the Huaibei long flame coal is blended by too large ratio, then the explosion accident of the mill may happen easily. The pulverizing characteristics of the coal, the particle size distribution of the blended pulverized coal, the particle size segregation of the blended pulverized coal and the exhalation characteristics of the volatile matter of the Huaibei long flame coal were researched; and comparing with commonly used coal, it was found that the Huaibei long flame coal has not exclusive obvious explosion fatalness. According to the heat balance calculation and analysis of the mill, it was obtained that the basic reason of the higher explosion fatalness of the long flame coal is its lower water content, which causes the recirculating air of the mill to increase. Combining with the lower CO exhalation temperature of the coal and the fineness segregation of the blended coal powder and other factors, at the initial stage of mixed process of recirculating air and hightemperature air, more fine particles of pulverized Lulingproduced coal may enter into local hightemperature zone, and large amount of CO will exhale; so the explosion probability of the mill will increase. Two methods were proposed: one of them is to reduce the ratio of the long flame coal in blended coal, the other is to open the cold air gate of the mill; and practice shows that the two methods are effective.
    技术交流
    Application of pneumatic dense phase ash handling system with internal bypass
    GAO Yuan
    2012, 34(6):  44-46. 
    Asbtract ( 894 )  
    Related Articles | Metrics
    Taking the project of 2×350MW thermal power unit of Datang Linzhou Thermal Power Company Limited as example, the fundamental principles of the pneumatic ash handling system was introduced. According to the practical operation curves, the application of the pneumatic dense phase ash handling system with internal bypass was analyzed. Aiming at the problems existing in operation, the solutions were given, which can be used as reference for design and application of the system.
    Reformation and application of lignite blended burning process in 200MW unit
    LI Tao;JIN Hua
    2012, 34(6):  47-50. 
    Asbtract ( 801 )  
    Related Articles | Metrics
    Aiming at the performance and characteristics of the boilers of the Harbin Third Power Plant of Huadian Energy Company Limited, the problem of lignite blended burning process in 200MW unit was studied. To improve the economic efficiency of the unit is taken as first purpose. According to the load of the unit and the supplied coal in different time segments of every day, the lignite blending principle was determined. Based on this, the lignite blending technology was improved; the feasibility of lignite blending in maximum ratio for the unit was discussed; and the economic efficiency of lignite blended burning was analyzed. Then the latent capacity of economic operation was excavated in largest possible, and energysaving and benefit increasing were realized truly.
    Reason analysis and treatment method of temperature rise of generator slip ring electric brush
    WANG Shaoping
    2012, 34(6):  51-53. 
    Asbtract ( 970 )  
    Related Articles | Metrics
    In the operation of generator set No.12 of Panzhihua Branch of Huadian Sichuan Power Generation Corporation Limited, the temperature of the six positive pole electric brushes of the rotor rises alternately, and the maximum temperature of individual brush rises up to 300℃. It was confirmed by analysis that the reason of the temperature rise of the electric brush is the blockage of the small holes ducts on the slip ring by deposition. The treatment method of temperature rise of electric brushes of generator in operation was given. Aiming at unit overhaul process, some concrete requirements of the maintenance quality of the rotor slip ring and accessory devices and acceptance inspection were given, which is helpful for ensuring safe operation of the unit.
    Analysis on incorrect tripping accident of protection device caused by defect in secondary circuit of voltage transformer
    WEI Gang;WANG Xiaoqi
    2012, 34(6):  54-55. 
    Asbtract ( 1030 )  
    Related Articles | Metrics
    The connection of the secondary circuit of voltage transformer is crucial to safety of the power grid, and under certain conditions, the defect existing in the secondary circuit of voltage transformer may easily lead to incorrect tripping of protection device. An incorrect tripping accident of protection device caused by defect in the secondary circuit of the voltage transformer was introduced. The reasons of the accident were analyzed, and relevant solution was proposed.
    Analysis of anomaly in turbine latchon operation caused by fault of latchon electromagnetic valve
    CUI Yanting;YANG Shaoxuan;WANG Qing
    2012, 34(6):  56-57. 
    Asbtract ( 1166 )  
    Related Articles | Metrics
    The turbine latchon process was introduced. The hazard caused by fault of latchon electromagnetic valve was analyzed. A typical case occurred in startup process of an 80MW unit was expounded, in which, after the highpressure oil pump started, the steam turbine can not be latched on. After the fault had been treated, the unit had been latched on successfully.
    Reason analysis and treatment of unit lower vacuum trip caused by vacuum pump refusing to linked act
    WEI Shengluan
    2012, 34(6):  58-59. 
    Asbtract ( 871 )  
    Related Articles | Metrics
    In the switch over process of the service power supply in unit No.11of the Panzhihua Branch of Huadian Sichuan Power Generation Company Limited ,the voltage of 400V I B segment was failed, the butterfly valve of the operation vacuum pump B could not linked, and the standby vacuum pump A could not linked startup, which caused the lower vacuum tripping of the unit. The reasons of the faults were analyzed, and it was determined that the main reason of the unit lower vacuum tripping is irrational design of the control loop of vacuum pump. A series of technical improvement measures were adopted, and the operation reliability and safety of the unit were increased effectively.
    Analysis on excessive current of booster pump of turbinedriven feed pump and treatment
    MIN Chengyong
    2012, 34(6):  60-62. 
    Asbtract ( 1184 )  
    Related Articles | Metrics
    The excessive current of the booster pump of the YNKn300-200-20Y/J turbinedriven feed pump in Yunfu Power Plant was analyzed, and the possible reasons were inspected one by one. It was found that the erosive wear of the sealing surface of the pump case and the sealing surface of the pump end cover causes larger leakage, and the larger leakage leads excessive current of the motor. The spray coating treatment was adopted for the sealing surfaces, and the current of the motor returned to normal value.
    Reason analysis and prevention of cooling water polluted by pickling wastewater
    XU Guoquan
    2012, 34(6):  63-64. 
    Asbtract ( 992 )  
    Related Articles | Metrics
    In the boiler acid washing process, due to that the water quality in the case of boiler water recirculating pump does not satisfy the requirement; the cooling water in the shell of the motor is polluted easily; the filter screen for cooling water circulation is blocked and the cooling efficiency of the cooling water decreases. So, the temperature of the motor will rise rapidly, the boiler water pump will trip and the unit will shut down. Aiming at abovementioned problems, effective treatment and preventive measures were proposed, and the safety, the stability and the economic benefit of the unit were improved.
    Analysis on congestion of public communication network and countermeasures
    JING Lei;YANG Yongshang
    2012, 34(6):  65-66. 
    Asbtract ( 927 )  
    Related Articles | Metrics
    In Baotou Power Generation Branch of Huadian Inner Mongolia Energy Company Limited, during public data calling process from the units No.1 and No.2, some blue points occurred on the picture, and the system response was slower. Based on field inspection and analysis of the problems existing in public communication network, some concrete measures were adopted, which include regulating the period and phase of the controller, deleting a part of useless configurations, reducing the data acquisition time of the plant level SIS from DCS, avoiding the units No.1 and No.2 to call public data at the same time and so on. The communication load of the public communication network was decreased effectively, which lays a good foundation for safe and stable operation of the units.
    节能与环保
    Influence of desulphurization additives on wet desulphurization system
    SHEN Yuhui;SU Junhua;GAO Huihua;JIN Ying shan
    2012, 34(6):  67-69. 
    Asbtract ( 838 )  
    Related Articles | Metrics
    In order to research the influence of the desulphurization additives on the wet limestonegypsum FGD system, the desulphurization additives experiment had been carried out in the 330MW unit of Hubei Huadian Xisaishan Power Generation Company Limited. The variations of some parameters, such as the contents of CaCO3,Cl- and CaSO3 in the slurry in absorption tower and the CaSO4 content and the water ration in the gypsum before and after the experiment were analyzed. The experiment result shows that by using the desulphurization additives, when the volume fraction of SO2 in flue gas in inlet of absorption tower is 0.7%, the SO2 removal efficiency increased from 92% to 95%, two slurry circulating pumps were shut down, the content of Cl- in absorption tower decreased, the utilization rate of the CaCO3 increased, the gypsum purity increased, and the water ratio of the gypsum was reduced.
    Application of selective catalytic reduction flue gas denitration technology in Zhang shan Power Generation Company Limited
    XIAO Ruigang;WANG Zhihu
    2012, 34(6):  70-72. 
    Asbtract ( 1038 )  
    Related Articles | Metrics
    The SCR flue gas denitration technology is one of current flue gas denitration technologies most widely applied in power plants. Combining with the application of the SCR flue gas denitration technology in the 2×600MW unit of Zhangshan Power Generation Company Limited, the basic principle, the process flow and the arrangement manner of SCR flue gas denitration technology were introduced. The problems existing in practical application of SCR technology were pointed out, and , some suggestions were given aiming at these problems.
    新能源
    Fast estimation of wind farm investment based on support vector machine
    FANG Jiang;LIU Qingchao
    2012, 34(6):  73-76. 
    Asbtract ( 873 )  
    Related Articles | Metrics
    The investment estimation of a wind farm project is an important basis of the project investment decision. The precision of the investment estimation is the key factor which makes the investment decision to be right or bad. The major factors influencing on the investment were analyzed; an investment estimation model based on support vector machine (SVM) was established; and 13 important affecting parameters were determined finally. The model was simulated and verified by actual engineering data, and the simulation result shows that the forecast precision of the model is higher.