    A cost reckoning method for DCCHP considering the prediction error
    JING Weizhe, LIU Yang, TIAN Yudi
    2017, 39(5):  1-6. 
    Asbtract ( 290 )   PDF (1414KB) ( 849 )  
    Related Articles | Metrics
    Calculating the cost of distributed combined cooling, heating and power system (DCCHP), the data of source and load usually use the predicted values at present. However, the limitation of load forecasting method and renewable energy forecasting method can cause the data prediction error and affect the accuracy of the combined system cost calculation further. In this paper, a model of DCCHP which has complete components is established. Sampling the data of load and renewable energy outputs to simulate the predicted errors of the data, the typical scenarios can be built by the LHS scenarios reduction process. For each of typical scenarios, the cost is calculated and weighted by its occurrence probability to generate the cost considering the prediction error. Finally, simulation of a typical DCCHP and sensitivity analysis certify that for the predicted values of different accuracy the method proposed by this paper can calculate the system cost accurately and provide effective reference for practical system planning and design.
    Coalfired power plant waste SCR catalyst harmless blending combustion study and feasibility analysis
    WAGN Lele, YANG Xiaoning, HE Chuan, YAO Yan, KONG Fanhai, WANG Lipeng, ZHANG Fajie, SONG Yubao
    2017, 39(5):  7-11. 
    Asbtract ( 270 )   PDF (1229KB) ( 573 )  
    Related Articles | Metrics
    Due to the application of selective catalytic reduction (SCR) on coalfired power plant, the problem of waste catalytic becomes increasingly outstanding. The technology to dispose waste catalyst in worldwide was analyzed. Refer to slurry blending combustion technology, a waste catalytic blending combustion plan was indicated. Cleaning test approved that catalyst leaching toxicity meet the limit of toxicity identification standard regulations of the state, including the content of trace elements is lower than conventional coal. Blending test and calculation approved that the pollutant emission is under control. The technology has the simple process, low environmental risk and low disposal cost. This could be widespread.
    Windsolarbattery power microgrid optimization study based on electromagnetismlike mechanism
    MA Xiaojuan, LIU Yang, PAN Yapei
    2017, 39(5):  12-16. 
    Asbtract ( 326 )   PDF (860KB) ( 540 )  
    Related Articles | Metrics
    Based on the character of windsolarbattery power microgrid, an optimal dispatching strategy for system individual operation mode was indicated. The optimal capacity configuration model was build and calculated by electromagnetismlike mechanism. The model and mechanism were approved by simulation.
    Large scale circulating fluidized bed boiler energy saving ultralow emission approach discuss
    BAI Yang
    2017, 39(5):  17-19. 
    Asbtract ( 411 )   PDF (1200KB) ( 703 )  
    Related Articles | Metrics
    The existing large scale circulating fluidized bed boiler environmental protection technology roadmap was analyzed and summarized. The author indicated that the low cost selective noncatalytic reduction (SNCR) could be added if the ultralow emission requirements cannot by satisfied by boiler operational adjustment or boiler reconstruction. Limestone infurnace desulphurization, semidry outfurnace desulphurization and ultraclean electrostaticbag composite dust removal shall be preferred for desulphurization and dust removal.
    Power plant attemperation water mass quantity flow characteristic analysis
    LIU Hai, HOU Benjie, YANG Feng
    2017, 39(5):  20-23. 
    Asbtract ( 314 )   PDF (1580KB) ( 551 )  
    Related Articles | Metrics
    By analyzing power plant operation data under steady condition and variable load condition, accurate power plant boiler attemperation water mass flow characteristic curve was indicated. Based on this characteristic curve, attemperation water mass quantity was effectively controlled. Main steam quality was improved. The unit operation economy and safe was enhanced.
    New type submerged chain conveyor tension and retaining device development and application
    GUO Junhai1, JIA Shaogang2, LOU Haitao1, HU Yawei1, MI Zhiwu1, ZHANG Xing1, ZHENG Wei1
    2017, 39(5):  24-26. 
    Asbtract ( 399 )   PDF (2341KB) ( 780 )  
    Related Articles | Metrics
    A unit was forced to stop operation or low load operation due to submerged chain conveyor tension device frequent failure. After research, the automatic hydraulic system was not featured with depressurized retaining or standby tension. Failure caused chain fall off. After improvement on the tension device, constriction retaining and manual tension were added on the system. The failure hours reduced by 91.8%. Energy generated was increased by 20GW·h. The reliability and economy was increased remarkably.
    Secondary device precast bin capillary module duct air conditioner and fan composite radiating solution study
    GU Mingfei, YUAN Difei
    2017, 39(5):  27-29. 
    Asbtract ( 234 )   PDF (1349KB) ( 610 )  
    Related Articles | Metrics
    Substation secondary device requires environmental temperature. The ideal operation temperature is 20.0℃ to 25.0℃. Traditional radiating solution for secondary precast bin was introduced. And the drawback was indicated. This paper introduced a composite radiating solution that combined air conditioner and fan. This solution featured with well heat balance, high reliability, and remarkable energysaving effect.
    Practice and exploration of preventing spontaneous combustion in enclosed circular coal yard
    CHEN Wei
    2017, 39(5):  30-31. 
    Asbtract ( 224 )   PDF (1016KB) ( 789 )  
    Related Articles | Metrics
    This paper analyzed and summarized the coal spontaneous combustion phenomenon in the operation management practice of circular coal yard. It introduced the characteristics of spontaneous combustion of circular coal yard, preliminary mastered its regularity, and proposed some measures to preventing spontaneous combustion, which accumulated some experience for the further management of circular coal yard.
    670MW supercritical unit valve switching failure cause analysis and treatment
    HE Donghui, YE Zhenqi, DING Yongyun
    2017, 39(5):  32-35. 
    Asbtract ( 228 )   PDF (1645KB) ( 718 )  
    Related Articles | Metrics
    In a power plant’s 670MW supercritical unit startup stage, valve switching of total valve (TV) and governing valve (GV) failed. After analyzing HPIP cylinder unite startup speed and valve switching logic, and comparing the stress of main stop valve before and after opening, the failure cause was indicated that main steam pressure and reheat steam pressure are too low. Authors claimed that by adjusting the pressure of main steam and reheat steam would reduce the opening and pressure difference of GV. This will ensure the success of valve switching and reduce the valve switching time.
    Power automation device industrial molding design
    YU Chunlin1,2, HANG Renping1,2, CHEN Fufeng1,2
    2017, 39(5):  36-38. 
    Asbtract ( 190 )   PDF (914KB) ( 604 )  
    Related Articles | Metrics
    This paper introduced the necessity of power automation device industrial molding design. Based on the various application forms, product appearance DNA design method based on company brand strategy was indicated. The normal and local power automation device industrial design process was introduced. After demand analysis, product appearance was divided to multiple individual factors. Characteristics of individual elements from multiple dimension analysis and the connection between elements,summed up the characteristics of the product style suitable for power system automation device, and on the basis of physiological aesthetic and manmachine engineering research and design.
    Design and realization of whole process monitoring system for power construction site
    ZHOU Jing, REN Chong, RU Yuqing, LI Jie
    2017, 39(5):  39-41. 
    Asbtract ( 245 )   PDF (850KB) ( 697 )  
    Related Articles | Metrics
    This paper firstly discussed the reasons of safety accidents at power construction site and the current safety management modes. After that, it analyzed the existing problems of the current safety management modes. At last, it designed and realized a whole process monitoring system for the above problems at power construction site, which regulated the work behavior of the staff and improved the safety factor of power construction.
    DCS loop fault analysis and treatment
    HUA Lei
    2017, 39(5):  42-43. 
    Asbtract ( 223 )   PDF (770KB) ( 523 )  
    Related Articles | Metrics
    The structure of ABB Symphony control system was introduced. The loop structure was detailed analyzed. Based on a loop communication fault, and the cause and treatment was analyzed. Advices for control system maintenance were indicated. 
    Mistaken stop by governing and protecting system analysis
    SHU Yonghui
    2017, 39(5):  44-49. 
    Asbtract ( 206 )   PDF (3630KB) ( 846 )  
    Related Articles | Metrics
    The governing and protecting system of a power plant 100MW unit was detailed introduced. Two mistaken stop incidents caused by defects of governing and protecting system were analyzed. Inspection and treatment of these two incidents was summarized. An improvement and prevention measures was indicated.
    Seawater cooling system marine organism pollution control treatment
    XIA Shouqing, CHEN Chunling
    2017, 39(5):  49-51. 
    Asbtract ( 263 )   PDF (1163KB) ( 1082 )  
    Related Articles | Metrics
    The sea life pollution of the seawater cooling system has many adverse effects on the economy and safety of the generator unit. The life habits of barnacle and other marine fouling was studied. The problems and new control plan of chlorination treatment was analyzed. The problem of marine organism polluting of seawater cooling system was effectively solved.
    A power plant’s high temperature reheater outlet TP347H material pipeline leakage cause analysis
    WEI Quanquan, NIU Yujing
    2017, 39(5):  52-54. 
    Asbtract ( 290 )   PDF (934KB) ( 583 )  
    Related Articles | Metrics
    To implement flow path and capacity expansion reconstruction to built power plant is high efficient and low cost. This is one of the effective measures to increase efficiency, save energy and increase power supply. After boiler heating surface expansion, better metal material was required due to higher temperature and pressure. After capacity expansion, a power plant’s high temperature reheat outlet TP347H pipe leaked. After site inspection, section macroscopic test, chemical test, metallurgical analysis and hardness test, it was found that the material solution treatment was not sufficient after work hardening, and caused performance reduction and leakage.
    Precise equipment diagnostic technology practice and application
    XU Jianli
    2017, 39(5):  55-57. 
    Asbtract ( 255 )   PDF (1061KB) ( 691 )  
    Related Articles | Metrics
    :Form Huadian Xinxiang Power Generation Company Limited implemented equipment precise diagnostic technology,the big data of equipment operation was build. The equipment managing was lead forward. Equipment overmaintenance and lackofmaintenance were effectively prevented. Two practices approved that the precise diagnostic technology improved equipment scientific management and lowered maintenance cost.
    Treatments of the large vibration problem of primary air fan for Hubei Xiangyang Power Plant
    WANG Pingbo
    2017, 39(5):  58-59. 
    Asbtract ( 315 )   PDF (746KB) ( 801 )  
    Related Articles | Metrics
    Taking the large vibration problem of primary air fan for Hubei Xiangyang Power Plant as an example, and facing the situation of its complicated reasons, including the bearing wear and unbalance, this paper found the failure bearing accurately using the EA expert system and replaced it. After that, the large horizontal vibration problem still existed. Then a further analysis was conducted and a dynamic balance treatment was dealt with, At last, the large vibration problem of primary air fan was solved completely.
    Application practice of threedimensional digital management system in a circular coal yard
    ZHANG Haiyang, ZANG Jie
    2017, 39(5):  60-61. 
    Asbtract ( 269 )   PDF (722KB) ( 732 )  
    Related Articles | Metrics
    Coal yard management is an important part of power plant fuel management. This paper introduced the application practice of threedimensional digital management system in a circular coal yard of Huadian Laizhou Power Generation Company Limited, and described the main functions and characteristics of the system. The construction of this system could improve the lean management level, realize the digital fuel information management of a coal yard, and also have a positive effect on promoting the work of stocktaking, mixed burning, purchasing and spontaneous combustion preventing, etc.
    Partial heat treatment common problem analysis and treatment
    LI Junfeng, YAO Pengle, ZHAO Yongyuan, WANG Qing
    2017, 39(5):  62-63. 
    Asbtract ( 395 )   PDF (721KB) ( 639 )  
    Related Articles | Metrics
    Based on construction practice, the cause and expression of joint postweld heat treatment common problems was analyzed from heat input, thermocouple and heater. Treatment measures were provided for each of heating stage, constant stage and temperature fall stage. The situation of abnormal hardness after fault was analyzed. Treatment measurements were provided based on standards and metal phase transformation principle. Prevention measurements to avoid postweld heat treatment were provided based on production practice.
    Pipe application and practice of natural gas branch line cleaning pipe line
    PAN Wenliang
    2017, 39(5):  64-65. 
    Asbtract ( 250 )   PDF (729KB) ( 680 )  
    Related Articles | Metrics
    This paper introduced the necessary condition and procedure of natural gas branch pigging, and indicated difficulties and treatment measures accordingly. The purpose of pipeline pigging is for the preparation of pipeline internal inspection. By pigging and internal inspection, potential risk will be determined. Implement natural gas branch technical prevention measurements, underline specific rectification objective. And eventually enhance high pressure pipeline potential risk treatment measurements.
    Physical and chemical parameters that affect limestonegypsum desulfurization efficiency
    XIANG Xiaodong, LIU Liwei, ZHAO Haijiang, LIU Kaihui
    2017, 39(5):  66-69. 
    Asbtract ( 200 )   PDF (913KB) ( 809 )  
    Related Articles | Metrics
    Limestonegypsum wet flue gas desulfurization (FGD) system is widely used in worldwide benefited from high desulfurization efficiency and low operational cost. The desulfurization efficiency is affected by pH value, limestone activity, SO2 mass density, dust removal efficiency, moisture balance, FGD outlet dust content and other physical and chemical parameters. After comparison, physical and chemical parameters that affect desulfurization efficiency from strong to weak is pH value, limestone activity, SO2 mass density, dust removal efficiency, moisture balance, and FGD outlet dust content.
    360MW unit SCR denitration system operation improvement simulation
    LIANG Xiujin, ZHU Yue, WEI Hongge
    2017, 39(5):  70-73. 
    Asbtract ( 303 )   PDF (1379KB) ( 538 )  
    Related Articles | Metrics
    Based on a 360MW unit SCR denitration reactor and site operation data, simulation of ammonia injection improvement and fluid field improvement was carried out. The result indicated that inlet fluid field is nonuniform. Which obviously reflect at NOx distribution andvelocity field. By dividing control zone and adjusting ammonia injection quantity, ammonianitrogen ratio was reduced from 10.0% to under 1.5%. By improving deflector structure, the first layer catalytic inlet velocity field was notably improved. Which indicated that the flow field after ammonia injectiongrating doesn’t affect ammonianitrogen ratio. Ammonianitrogen ratio is determined by reactor inlet flue gas flow field and ammonia injection method.
    Ladderform energy utilization technology study in heat supply reconstruction
    SHANG Yongqiang
    2017, 39(5):  74-76. 
    Asbtract ( 325 )   PDF (834KB) ( 651 )  
    Related Articles | Metrics
    This paper raised a heat supply steam waste pressure recycling system that utilize heat supply extraction waste pressure for backpressure turbine power generating, and supply steam, exhausted by backpressure turbine, to heat network heater. This system efficiently used heat supply steam extraction, increased heat supply unit generating capacity, lowered unit service power utilization. Economic benefit is significant.