华电技术 ›› 2012, Vol. 34 ›› Issue (5): 24-25.

• 研究与开发 • 上一篇    下一篇

泸定水电站 #4机组定子铁损试验分析

张本坚1,张亚科2   

  1. 1.中国水利水电第七工程局有限公司,四川成都610081;2.煤炭工业郑州设计研究院有限公司,河南郑州450007
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2012-05-25 发布日期:2012-05-25

Analysis on iron loss test of stator of unit No.4 in Luding Hydropower Station

ZHANG Benjian1, ZHANG Yake2   

  1. 1.Sinohydro Bureau 7 Company Limited, Chengdu 610081, China; 2.Zhengzhou Design and Research Institute of Coal Industry Company Limited, Zhengzhou 450007, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2012-05-25 Published:2012-05-25

摘要: 介绍了泸定水电站发电机定子铁损试验的原理、计算方法、接线及设备选择情况,通过对 #4机组试验数据的分析,证实了定子铁芯叠片质量及现场安装工艺符合相关要求,说明了试验方法的可行性。

关键词: 发电机, 定子, 铁损试验, 分析

Abstract: The theory, the calculation method, the connection and the devices selection of the generator stator iron loss test in Luding Hydropower Station were introduced. Based on the analysis of the test data of unit No.4, it is verified that the quality of the stator core lamination stack and the field installation technology are accorded with relevant requirement, and it was verified that the test method is feasible too.

Key words: generator, stator, iron loss test, analysis