摘要: 在AP1000电站中,保护和安全监控系统是基于Common Q平台设计的安全级仪控系统。为确保电站运行前保护和安全监控系统满足系统设计功能要求,采用交叠测试方法对保护和安全监控系统进行了预运行测试。结合保护和安全监控系统的结构和功能,对保护和安全监控系统预运行测试进行介绍和分析,供预运行测试时参考。

关键词: AP1000电站, 保护和安全监控系统, 预运行测试, 交叠测试, 分析

Abstract: In the AP1000 nuclear power plant, the protection and safety monitoring system (PMS) is a safety I&C system, which is designed based on the Common Q platform. Before the plant is put into operation, in order to ensure the PMS can satisfy the designed system function requirement, using the overlap test method, the PMS preoperational test was carried out. Combining with the structure and function of PMS, the PMS preoperational test was introduced and analyzed in this paper, which can be used as reference for preoperational test.

Key words: AP1000 nuclear power plant, protection and safety monitoring system (PMS), pre-operational test, over-lap test, analysis