[1] |
人民日报社. 习近平在第七十五届联合国大会一般性辩论上发表重要讲话[N]. 人民日报, 2020-09-23(1).
|
[2] |
国家电网公司. 国家电网公司发布“碳达峰、碳中和”行动方案[N]. 国家电网报, 2021-03-02(1).
|
[3] |
浙江省科技厅. 浙江省出台碳达峰碳中和科技创新行动方案[EB/OL].(2020-7-19)[2021-12-20]. http://www.most.gov.cn/dfkj/zj/zxdt/202106/t20210618_175262.html.
|
[4] |
吉斌, 孙绘, 梁肖, 等. 面向“双碳”目标的碳电市场融合交易探讨[J]. 华电技术, 2021,43(6):33-40.
|
|
JI Bin, SUN Hui, LIANG Xiao, et al. Discussion on convergent trading of the carbon and electricity market on the path to carbon peak and carbon neutrality[J]. Huadian Technology, 2021,43(6):33-40.
|
[5] |
人民日报社. 推动平台经济规范健康持续发展把碳达峰碳中和纳入生态文明建设整体布局[N]. 人民日报, 2021-03-16(1).
|
[6] |
喻小宝, 郑丹丹, 杨康, 等. “双碳”目标下能源电力行业的机遇与挑战[J]. 华电技术, 2021,43(6):21-32.
|
|
YU Xiaobao, ZHENG Dandan, YANG Kang, et al. Opportunities and challenges faced by energy and power industry with the goal of carbon neutrality and carbon peak[J]. Huadian Technology, 2021,43(6):21-32.
|
[7] |
浙江省发改委. 浙江省可再生能源发展“十四五”规划(征求意见稿)[EB/OL].(2021-07-19)[2021-12-20]. http://fzggw.zj.gov.cn/art/2021/3/12/art_1229123367_2251024.html.
|
[8] |
路轶, 胡晓静, 孙毅, 等. 适应高水电占比的电力现货市场机制设计与实践[J]. 电力系统自动化, 2021,45(9):162-170.
|
|
LU Yi, HU Xiaojing, SUN Yi, et al. Design and practice of electricity spot market mechanism adapting to characteristics of high proportional hydropower[J]. Automation of Electric Power Systems, 2021,45(9):162-170.
|
[9] |
于旭光, 李亚鹏, 贾泽斌, 等. 考虑现货市场竞价空间的梯级水电站中长期合同电量分解模型[J]. 电力系统自动化, 2021,45(6):62-71.
|
|
YU Xuguang, LI Yapeng, JIA Zebin, et al. Medium and long term contract energy decomposition model for cascade hydropower station considering spot market bidding space[J]. Automation of Electric Power Systems, 2021,45(6):62-71.
|
[10] |
于旭光, 李刚, 李亚鹏, 等. 计及电价风险和差价合同的梯级水电站日前市场竞价模型[J/OL]. 电力系统自动化:1-11(2021-11-29)[2022-2-15]. http://kns.cnki.net/kcms/detail/32.1180.TP.20211126.1321.002.html.
|
|
YU Xuguang, LI Gang1, LI Yapeng, et al. Day-ahead market bidding model for cascade hydropower station considering price risk and contract for price difference[J/OL]. Automation of Electric Power Systems:1-11(2021-11-29)[2022-2-15]. http://kns.cnki.net/kcms/detail/32.1180.TP.20211126.1321.002.html.
|
[11] |
贾泽斌, 申建建, 程春田, 等. 基于梯级电量联动控制的高比例水电电力市场日前现货出清方法[J]. 中国电机工程学报, 2021,41(23):8033-8046.
|
|
JIA Zebin, SHEN Jianjian, CHENG Chuntian, et al. Day-ahead clearing method for high proportion hydropower electricity market based on cascade energy linkage control[J]. Proceedings of the CSEE, 2021,41(23):8033-8046.
|
[12] |
钟儒鸿, 程春田, 廖胜利, 等. 兼顾多电网调峰与水电消纳的跨流域梯级水电站调度方法[J]. 电力系统自动化, 2021,45(14):114-122.
|
|
ZHONG Ruhong, CHENG Chuntian, LIAO Shengli, et al. Inter-basin scheduling method of cascaded hydropower plants considering multi-grid peak shaving and hydropower accommodation[J]. Automation of Electric Power Systems, 2021,45(14):114-122.
|
[13] |
张粒子, 刘方, 许通, 等. 多主体梯级水电参与日前市场下游电站自调度投标策略[J]. 电力系统自动化, 2018,42(19):27-33.
|
|
ZHANG Lizi, LIU Fang, XU Tong, et al. Self-scheduling bidding strategy for downstream station in day-ahead market with participation of multi-operator cascade hydropower stations[J]. Automation of Electric Power Systems, 2018,42(19):27-33.
|
[14] |
于旭光, 李刚, 李亚鹏, 等. 耦合日合同分解及日前市场竞价的梯级水电站短期鲁棒优化调度[J]. 电网技术, 2021,45(10):4016-4025.
|
|
YU Xuguang, LI Gang, LI Yapeng, et al. Short-term robust optimization scheduling of cascade hydropower stations coupled withdaily contract decomposition and day-ahead market bidding[J]. Power System Technology, 2021,45(10):4016-4025.
|
[15] |
温世杨, 余娟, 代伟, 等. 考虑水电库容弹性的电力系统经济调度[J]. 电力系统自动化, 2020,44(19):73-82.
|
|
WEN Shiyang, YU Juan, DAI Wei, et al. Economic dispatch of power system considering capacity flexibility of hydropower reservoir[J]. Automation of Electric Power Systems, 2020,44(19):73-82.
|
[16] |
李健华, 刘继春, 陈雪, 等. 含可再生能源的多能互补发电系统容量配置方法[J]. 电网技术, 2019,43(12):4387-4398.
|
|
LI Jianhua, LIU Jichun, CHEN Xue, et al. Capacity allocation of multi energy complementary system including renewable energy[J]. Power System Technology, 2019,43(12):4387-4398.
|
[17] |
王一铮, 李忠憓, 黄晨宏, 等. 促进间歇性可再生能源发电消纳的水电定价与能量管理策略[J]. 电力建设, 2021,42(3):107-116.
|
|
WANG Yizheng, LI Zhonghui, HUANG Chenhong, et al. Hydropower pricing and energy management strategies for promoting accommodation of intermittent renewable energy power generation[J]. Electric Power Construction, 2021,42(3):107-116.
|