Huadian Technology ›› 2009, Vol. 31 ›› Issue (12): 61-63.

• 技术交流 • Previous Articles     Next Articles

Analysis and solution of the main problems of boiler in 2×600MW orimulsion oil power plant

SONG Jinghui, LIU Qingxin   

  1. Guangdong Power Test and Research Institute, Guangdong Gride Company ,Guangzhou 510600, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2009-12-25 Published:2009-12-25

Abstract: The 2×600MW boiler of Zhanjiang Orimulsion Power Plant is the first boiler specially designed for burning orimulsion oil. Some problems existed in the plant, such as that the boiler can not get designed load, the ash conveying system was blocked, the air preheater was blocked and others. The reasons of these problems were analyzed, and, by research, the methods solving these problems were given.

Key words: orimulsion, boiler, ash conveying system, air preheater