Huadian Technology ›› 2010, Vol. 32 ›› Issue (6): 55-56.

• 技术交流 • Previous Articles     Next Articles

Feasibility analysis of operation at excess output of unit No.2 in Qingxi Hydropower Station

LIU Yuanxiong   

  1. Guangdong Yudean Qingxi Power Generation Corporation Limited, Dabu 514200, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2010-06-25 Published:2010-06-25

Abstract: The test purpose of the unit No.2 of the Qingxi Hydropower Station was introduced. The requirements of the test condition, the test procedure and the measured parameters of the unit No.2 were expounded. The conclusion of the test and the suggestions were given. It was pointed out finally that after the capacityenlarge reformation of the Qingxi Hydropower Station, not only the power generation and the peak shaving capacity were increased, but also the remarkable economical benefits and social effects were obtained. 

Key words: hydroelectric generator set, excess output, feasibility, efficiency