Huadian Technology ›› 2016, Vol. 38 ›› Issue (4): 27-29.

Previous Articles     Next Articles

Optimization and transformation analysis of ETS of large air cooling unit

  

  1. Shenhua Guoneng Energy Ningxia Coal Power Company Limited, Yinchuan 750410, China
  • Online:2016-04-25 Published:2016-07-11

Abstract:

Abstract:This paper analyzed safety and risk of ETS and PLC of a certain power plan.According to high degree of reliability and safety of safety devices systems of turbine,a safety control system reformation plan based on DCS has been brought up,which optimized both software and hardware of ETS and lead to the optimal control and configuration of system device and enhanced safety,reliability and economy of unit control system.

Key words: