Optimization of furnace safeguard supervision system of 200MW unit

DONG Maoliang   

  1. Huadian Energy Harbin Third Power Plant, Harbin 150024, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2011-08-25 Published:2011-08-25

Abstract: The problems existing in original FSSS of the 200MW unit boiler of Huadian Energy Harbin Third Power Plant were introduced. According to analysis of the system and practice, the optimized solution was summarized and implemented; the operation reliability of the unit was enhanced further.


Key words: 200MW unit, furnace safeguard supervision system (FSSS), optimization, programmable logic control (PLC) system