华电技术 ›› 2012, Vol. 34 ›› Issue (5): 40-42.

• 技术交流 • 上一篇    下一篇

火电厂自动发电量控制应对策略

和雄伟;赵俊斌   

  1. 山西漳山发电有限责任公司,山西长治046021
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2012-05-25

Control strategy of automatic generation control of thermal power plant

HE Xiongwei, ZHAO Junbin   

  1. Shanxi Zhangshan Power Generation Company Limited, Changzhi 046021, China
  • Received:1900-01-01 Revised:1900-01-01 Published:2012-05-25

摘要: 针对山西电网目前的现状,分析了双细则实施后山西电网自动发电量控制考核的具体情况,提出参与考核的火电厂应对双细则的自动发电量控制策略。

关键词: 双细则, 自动发电量控制, 策略

Abstract: Aiming at the current situation of the Shanxi Power Grid, the concrete situation of AGC examination of the Shanxi Power Grid after the ‘two detailed rules’ were implemented was analyzed; and the AGC control strategy for the thermal power plants taking part in the examination to response the ‘two detailed rules’ was put forward.

Key words: ‘two detailed rules’, automatic generation control (AGC), strategy