确定性动态规划求解发电优化的局限性分析

刘树林1,肖燕2   

  1. (1.中国华电集团公司 市场营销部,北京 100031;2.贵州乌江水电开发有限责任公司,贵州贵阳 550002)
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2013-03-25 发布日期:2013-03-25

Analysis on limitation of deterministic dynamic programming method in solving problem of power generation optimization of cascade hydropower plants

LIU Shulin1, XIAO Yan2   

  1. (1.Sales Dept of China Huadian Corporation, Beijing 100031, China; 2.Guizhou Wujiang Hydropower Development Company Limited, Guiyang 550002, China)
  • Received:1900-01-01 Revised:1900-01-01 Online:2013-03-25 Published:2013-03-25

摘要: 用确定性动态规划法求解梯级发电优化调度在国内生产实际中应用较多,分析了确定性动态规划法在求解梯级发电优化调度问题时由于方法本身的局限所产生的问题。确定性动态规划对寻求梯级中长期发电优化调度策略、发电计划分析具有一定的指导意义,但不宜求解短期发电调度最优问题。

关键词: 确定性动态规划, 梯级发电, 优化调度, 局限性

Abstract: The deterministic dynamic programming method is often used in domestic production practice to solve the problem of optimized dispatch of cascade hydropower plants. The problems of the deterministic dynamic programming method in solving cascade power generation optimized dispatch caused by the limitation of the method itself were analyzed. The deterministic dynamic programming method is of certain guiding significance for seeking cascade medium and long term power generation optimal dispatch strategy and the power generation plan analysis, however, it is not suitable to solve the problem of shortterm power generation dispatch optimization.

Key words: deterministic dynamic programming method, cascade power generation, optimized dispatch, limitation