Huadian Technology ›› 2010, Vol. 32 ›› Issue (4): 16-17.

• 专题综述 • Previous Articles     Next Articles

Analysis of circulating water system optimization for ultrasuper cirical coalfired units

CHANG Hailong   

  1. SEPCOIII Electric Power Construction Corporation, Laoshan 266100, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2010-04-25 Published:2010-04-25

Abstract: For coalfired power plant construction, in order to select better water circulating pump, condenser and cooling equipment, and to determine the size of structures, it is necessary to optimize the circulating water system. According to the natural conditions of the plant site and technical and economical conditions, based on the designed back pressure of the turbine (exhaust pressure), the optimization thinking and method for whole circulating water system were given. 

Key words: coal-fired power plant, 600MW unit, circulating water, optimization