Huadian Technology ›› 2010, Vol. 32 ›› Issue (4): 23-25.

• 研究与开发 • Previous Articles     Next Articles

Economical analysis and optimization for the operational of 135MW CFB boiler

CHEN Wencheng   

  1. Jiangsu Kanshan Power Generation Corporation Limited, Xuzhou 221134, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2010-04-25 Published:2010-04-25

Abstract: The operation conditions and existed problems of the 135MW CFB boiler in Jiawang Power Generation Corporation Limited of Shanghai Electric Power Company Limited were introduced. The problems of the coal grade variation, the air distribution, the bed pressure and temperature adjustment, the spray water quantity, the exhaust flue gas temperature and others were analyzed. The measures for ensuring the unit economical operation and the optimization suggestions were put forward.

Key words: circulating fluidized bed (CFB) boiler, economical analysis, optimization