Abstract:

The main problems existing in commissioning and commercial operation of the 2×150MW unit in Panzhihua Branch of Huadian Sichuan Power Generation

Company Limited were summarized. Combining with the structure features and practical situation of the unit, some response measures on system reformation and

operation adjustment were proposed, and the unit safe operation is ensured.