Huadian Technology ›› 2014, Vol. 36 ›› Issue (12): 32-34.

Previous Articles     Next Articles

Selection of main transformer ratio of Indonesia Bali Island Coalfired Power Plant

  

  1. (China Huadian Engineering Corporation Limited, Beijing 100160, China)
  • Published:2014-12-25

Abstract: Abstract:The general situation of the Indonesia Bali Island Coalfired Power Plant was introduced. The technical parameters about the main transformer ratio were checked. It was found that there were some contradictions in the main transformer ratio technical requirement proposed by Indonesia National Electric Power Company. The ratio of the main transformer was calculated. Aiming at above problem, the project contractor communicated with Indonesia National Electric Power Company, and the requirement of technical parameters of the main transformer was amended.

Key words: Keywords:Bali Island coalfired power plant, main transformer, ratio, tap changer