Loading...
RSS
Toggle navigation
Home
About Journal
Editorial Board
Editorial Board
Publication Ethics
Journal Online
Just Accepted
Current Issue
Archive
Most Read Articles
Most Downloaded Articles
Most Cited Articles
Subscription
Advertisement
Contact Us
中文
Table of Content
25 January 2011, Volume 33 Issue 1
Previous Issue
Next Issue
专题综述
研究与开发
技术交流
节能与环保
专题综述
Standardization study on optimal combination scheme of gland seal type selection for steam turbine set
NI Ding;SHEN Guoping
2011, 33(1): 1-4.
Asbtract
(
1487
)
Related Articles
|
Metrics
Due to diversification of technical development of steam turbine seal, when a power plant try reform its steam turbine for energy conservation, it is faced with a question: how to select various seals. According to the characteristics of the radial motion of turbine shaft under various conditions, the variation laws of seal safety gap and economical gap of steam turbine in two conditions were analyzed, and the classifying method of various gland seal was proposed, which provides more scientific and rational reference standard and basic principle for steam turbine seal reformation in power plants.
Realization of turbine governing valve calibration using Ovation system in operator workstation
GUO Bochun;XIAO Sheng
2011, 33(1): 5-8.
Asbtract
(
1615
)
Related Articles
|
Metrics
In the Ovation DCS, using the graphic language configuration, the calibration of the turbine governing valve servo system was realized in operator workstation. The method of the governing valve calibration and the matters needing attention were expounded. The method may be used as reference for the enterprises of the power generation, the steel smelting and the chemical industry, in which the Ovation system was used.
Research on protection system of ultrasupercritical steam turbine
AN Xiaomin
2011, 33(1): 9-13.
Asbtract
(
1325
)
Related Articles
|
Metrics
The equipment control strategy of protection system of ultrasupercritical steam turbine was expounded. The signal processing and operation principle of each protection circuit were introduced. According to several times tripping of the steam turbine, the problems existed in the system were analyzed, the improving scheme was put forward to raise the unit economical efficiency.
Reformation of drainage pipeline of axial exhaust fan in 600MW steam turbine
ZHANG Xuehai;MEI Sen
2011, 33(1): 14-15.
Asbtract
(
1179
)
Related Articles
|
Metrics
Aiming at the problem of obstructed drainage existed in axial exhaust fans No.1 and No.2 of 2×600MW unit in Huaneng Tongchuan Power Plant, two reformation schemes of axial exhaust fan drainage pipeline were analyzed. It was considered that connecting the drainage pipe in bottom of impellers stage I and stage II of axial exhaust fan directly into the inlet pipe can solve the problem of obstructed drainage. In Huaneng Tongchuan Power Plant, using the standby unattended time, the drainage pipes of axial exhaust fans No.1 and No.2 were reformed. After the reformation, the problem of obstructed drainage of axial exhaust fan was solved thoroughly, and desired result was obtained.
Reformation and debugging of highpressure intercept device of steam turbine
WU Xiangtao;LIU Jianrong;HE Hui
2011, 33(1): 16-17.
Asbtract
(
1444
)
Related Articles
|
Metrics
In the periodical flexibility test of highpressure intercept device of 335MW steam turbine in Huadian International Zouxian Power Plant, some potential hazards of shutdown accident occurred, which include the fault of pressure transducer, the jam of electromagnetic valve, the human error and others. The highpressure intercept electromagnetic valve was redesigned, and an isolating device was added. In the flexibility test, the online safe oil system is completely isolated. Then the shutdown risk caused by hardware fault or improper operation can be avoided.
Analysis on reason of jamming of steam turbine sliding key system and treatment
ZENG Jianbin
2011, 33(1): 18-20.
Asbtract
(
1493
)
Related Articles
|
Metrics
The jamming of sliding key system of steam turbine generator set was occurred in a thermal power plant, which caused the differential expansion of the unit to be exceeded the standard badly in start up and shut down process, and endangered the unit equipments and the operation safety. The jamming part of the key seat of sliding key system had been repaired, and the key had been replaced; so the jamming of the sliding key system was eliminated basically.
研究与开发
Analysis on network framework of Mark VI control system for gas turbine
MAO Huajun
2011, 33(1): 21-26.
Asbtract
(
1398
)
Related Articles
|
Metrics
The basic working principle of Mark VI turbine control system used in gassteam combined cycle generator unit was introduced. The applications of Ethernet, VLAN, the time synchronization and other technologies in the control system were analyzed. The related experiences were summarized.
Calculation method of alignment for shaft system of turbogenerator set
CUI Chuantao
2011, 33(1): 27-30.
Asbtract
(
1433
)
Related Articles
|
Metrics
The alignment of shaft system is very important in unit overhaul; it is important factor influencing on safe and economical operation of the unit. The purpose of alignment for shaft system of turbogenerator set was introduced. The concrete method of alignment for shaft system was expounded. The feasibility of the method was verified by practical example. By using this method, the work load of alignment in unit overhaul was reduced, and favorable result was obtained.
Research of two units and single circulating water tower operation technology in winter
ZHAO Xiaokun;YANG Zhongbiao
2011, 33(1): 31-32.
Asbtract
(
1437
)
Related Articles
|
Metrics
The water circulating pump of the 2×300MW unit of China Huadian Baotou Donghua Heat and Power Corporation Limited is driven by 50Hz power supply and is difficult to adjust the circulating water flow. In winter, the circulating water flow is smaller, and the serious icing occurs in the water tower, which causes that the pipe of the condenser is blocked, the terminal temperature difference and the subcooled temperature are increased, and the water consumption is increased too. According to the technical argumentation, the two units and single circulating water tower operation technology was adopted, the icing in water tower was avoided, the terminal temperature difference and the subcooled temperature were decreased, the water consumption was also reduced, and obvious economical benefits were obtained.
Application of centralized auxiliary network control system based on Xinhua XDPS-400e in Zehua Power Plant
WANG Jian;MA Liang
2011, 33(1): 33-35.
Asbtract
(
1511
)
Related Articles
|
Metrics
The design and application of the 2×330MW auxiliary network distributed control system of Luohe Power Generation Corporation Limited Zehua Power Plant project phase I were introduced. The features and the technical parameters of this auxiliary network were pointed out; the design idea and the working mode were analyzed, and typical application example of the auxiliary network established based on Xinhua XDPS-400e distributed control system was provided.
Discussion on real devices test method in electric starting test of large power unit
FAN Tao
2011, 33(1): 36-37.
Asbtract
(
1428
)
Related Articles
|
Metrics
The importance of real devices test in electric starting test was expounded. Aiming at main electric protection of different devices, the concrete test methods were put forward, and some suggestions for relay protection real devices test were given.
Development of video surveillance system for highvoltage switch
LI Yongqing;FU Shiping;LIU Yan;JIANG Bohua
2011, 33(1): 38-39.
Asbtract
(
1484
)
Related Articles
|
Metrics
A dynamic video image surveillance system for highvoltage switch was introduced. The system was designed specially to adapt to the structure features and operation characteristics of highvoltage switch. In this system, the highspeed infrared camera technique was used, which can monitoring realtime the highspeed sharp image of the internal structure of the highvoltage switch, can record, track, analyze and identify the video image in long term. The video surveillance system will play an important role for ensuring the safe and stable operation of the power system and enhancing the automatic dispatch level and the maintenance level of power system.
技术交流
Analysis of abnormal occurrence of WDPF system manual operation station
YAO Xiujuan;LIU San;HE Hui
2011, 33(1): 40-43.
Asbtract
(
1355
)
Related Articles
|
Metrics
Since the WDPFII distributed control system of Huadian International Zouxian Power Plant had been put into operation, the MA station was switched over from AUTO mode into LOCAL mode many times. It was decided by analysis that the abnormal occurrence is caused due to that the output frequency of the UPS, which supplies power for the WDPF system, was varied rapidly. It is desired that the result can be used as reference for fault analysis of similar DCS system.
Reason analysis of unit power interruption accident caused by water spurt from crack in the pipe
HUANG Haibo
2011, 33(1): 44-47.
Asbtract
(
1425
)
Related Articles
|
Metrics
In a power plant, the water spurt from crack in the pipe caused an instant earthing fault in 110kV line, and the zero sequence differential protection of start and standby auxiliary transformer No.1 was tripped incorrectly and caused the accident scope enlarged. The phenomenon of the accident and the accident treatment process were expounded. The experiences of the accident treatment were summarized. The problems exposed in the accident were analyzed. According to the protection action report and the accident field situations, the accident developing process and the action behavior of the relay protection were analyzed; and some concrete preventive measures were given.
Reason analysis of output deficiency of Milroyal metering pump and treatment
WANG Zhangsheng;WEN Shiwei;LIU Zhanli
2011, 33(1): 48-49.
Asbtract
(
1412
)
Related Articles
|
Metrics
The working principle of the Milton Roy hydraulic membrane metering pump was introduced. The reason of the output deficiency of the membrane pump in operation was analyzed, and relevant solving method was put forward, which can be used as reference for daily maintenance and troubleshooting of the membrane metering pump.
Reason analysis and treatment measures on frequent jitter of high pressure and low pressure regulating valves of small steam turbine
LIN Chun
2011, 33(1): 50-52.
Asbtract
(
2099
)
Related Articles
|
Metrics
In Fujian Huadian Kemen Power Generation Corporation Limited project phase I, when the unit operated under high load, the high pressure regulating valve of the small steam turbine was opened, a great quantity of cool reheating steam participated in working, and the high pressure regulating valve and low pressure regulating valve jittered frequently in large amplitude. According to analysis, it was considered that the fault reason is the setting of the overlap of high pressure regulating valve and the low pressure regulating valve of the small turbine tended to be larger. The degree of overlap had been modified in accordance with the value recommended by the manufacturer of the microelectrohydraulic control system devices, and the unit can operate normally in full load.
Analysis on leakage reasons of the tubes in water wall of a power plant boiler No.2
CHEN Jianjun
2011, 33(1): 53-54.
Asbtract
(
1436
)
Related Articles
|
Metrics
Aiming at the tear and leakage in buttjointed seam of the fastening combshaped plate for water wall tubes, according to the comprehensive analysis on the parts structure, the strained conditions, the operation environment and the welding quality, the main reasons caused tearing were affirmed, and some pertinent treatment measures were put forward.
A technical reformation of furnace refractory belt of one power plant boiler
WANG Xiaopeng;YUE Yinfu;FENG Yong;TIAN Hongwei
2011, 33(1): 55-56.
Asbtract
(
1443
)
Related Articles
|
Metrics
Taking the unit No.7 of Henan Zhongfu Industry Corporation Limited as an example, the technical requirement of furnace refractory belt design for power plant boiler was introduced. The technical reformation of furnace refractory belt of power plant boiler and relevant construction technology were expounded. This technical reformation is suitable for the boilers, in which the input flow of desuperheating water is smaller and the steam temperature adjustment is difficult. After the reformation, the input flow of desuperheating water was increased, the slagging in furnace was mitigated, and the effect of the main steam temperature adjustment became better.
Experience of commissioning of 135MW domestic circulating fluidized bed boiler
WANG Haibo;XIANG Ligang
2011, 33(1): 57-59.
Asbtract
(
1464
)
Related Articles
|
Metrics
The basic situation of DG440/13.7-II2 type 135MW circulating fluidized bed boiler in Henan Yima Ganguefired Power Plant was introduced. The processes of the cold functional test, the ignition pressurization and operation were expounded. The problems occurred in debugging were summarized, and the solving methods were put forward. After the adjustment based on combustion optimization test, the continuous operation ability and the reliability of the boiler had been raised. The experience can provide reference for similar units.
Application of metalsealed ball valve in draining system of thermal power plant
YUAN Xiongjun;FU Zhongxuan;ZHANG Min
2011, 33(1): 60-62.
Asbtract
(
1883
)
Related Articles
|
Metrics
The characteristics of draining system of thermal power plants and the use of drain valve were introduced. The technical characteristics of metalsealed ball valve were compared with those of traditional cutoff valve, and the technical characteristics of new type metalsealed ball valve were compared with those of traditional metalsealed ball valve. The conclusion obtained by the comparisons is that in the power plant startup drain system, the traditional cutoff valve will be replaced by the metalsealed ball valve gradually.
Pneumatic conveying test of cementitious material with hectometerlevel large drop
LIU Li;LIU Zekun
2011, 33(1): 63-64.
Asbtract
(
1196
)
Related Articles
|
Metrics
The method of pneumatic conveying of cementitious material with hectometerlevel large drop was introduced. The rationality and the feasibility of the technical scheme of pneumatic conveying of cementitious material with large drop were expounded, which provides the site experimental data and the technical scheme for Xiaowan Hydropower Station to convey the cementitious material with large drop in its construction and installation period.
节能与环保
Application of electrostatic demist technology in coalfired power plant
LIN Zuhan
2011, 33(1): 65-68.
Asbtract
(
1303
)
Related Articles
|
Metrics
The electrostatic demister has powerful function of trapping the fogdrop and the small dust particles and had been used in petrochemical and metallurgical industrials for more than 30 years. The working principle of the electrostatic demister was introduced; the development situation of the electrostatic demister in our country was expounded. Aiming at the operating environment of power plant, the key technology for developing higheffective electrostatic demister with high gas velocity was put forward. It was pointed out finally that the application and dissemination of the electrostatic demister in coalfired power plant will be helpful for energy conservation and emission reduction.
Energysaving reformation of closed cooling water system of thermal power plant
CHEN Peng;SHI Zhaohui;SONG Youxiang
2011, 33(1): 69-70.
Asbtract
(
1385
)
Related Articles
|
Metrics
The problems occurred in operation of the closed cooling water system were introduced. The feasibility of the energysaving reformation for the closed cooling water system was analyzed. After the relevant measures were adopted, and obvious energysaving effects were obtained.
Reformation of electrostatic precipitator control system in 600MW power plant
CHAI Zuyun;SUN Dongxin;LI Lizhi;LIANG Junbin
2011, 33(1): 71-74.
Asbtract
(
1251
)
Related Articles
|
Metrics
The energy saving reformation of electrostatic precipitator control system in Hebi Fenghe Power Generation Corporation Limited was introduced. The energy saving theory of electrostatic precipitator control system was explained; the reformation scheme and construction plan were described; the significances of the power controller and the turbidity meter feedback for energy saving control were expounded. By comparing with the operation condition before reformation, it was proved that after reformation the more excellent technical data were achieved, the energy saving efficiency was increased, and the automation level of operation and management was raised. The significance of the energy saving reformation of electrostatic precipitator control system was affirmed, and its application and dissemination in power plant were analyzed and forecasted.
Discussion on technology of reusing petrochemical waste water as circulating cooling water of power plant
QIN Haixia
2011, 33(1): 75-77.
Asbtract
(
1359
)
Related Articles
|
Metrics
After advanced treatment, the regenerated water can be reused as circulating cooling water of power plant. The advanced treatment process of the petrochemical waste water in a power plant was introduced. In this process, the aeration biological fluidized tank + coagulation clarification process were adopted to treat the petrochemical waste water; the coagulation clarification treatment with adding lime was adopted to treat the exhaust waste water of power plant circulating water. The two kinds of waste water are merged, and then are filtered in the filter with variable holes. The quality of the output water of the filter can attain the standard of power plant circulating cooling water and is used in production.
Author Center
Online Submission
Citation Format
Copyright Agreement
Template
Author Guidelines
Review Center
Peer Review
Editor Work
Editor-in-Chief
Office Work
Journal Online
Just Accepted
Current Issue
Archive
Most Read Articles
Most Downloaded Articles
Most Cited Articles