Loading...
RSS
Toggle navigation
Home
About Journal
Editorial Board
Editorial Board
Publication Ethics
Journal Online
Just Accepted
Current Issue
Archive
Most Read Articles
Most Downloaded Articles
Most Cited Articles
Subscription
Advertisement
Contact Us
中文
Table of Content
25 December 2010, Volume 32 Issue 12
Previous Issue
Next Issue
专题综述
研究与开发
技术交流
节能与环保
新能源
专题综述
Application of series resonance with variable inductor and variable frequency in generator test
CHENG Jianfeng
2010, 32(12): 1-3.
Asbtract
(
1459
)
Related Articles
|
Metrics
The requirements and the fundamental of the AC withstand voltage test using the series resonance with variable inductor and variable frequency were introduced. Based on this, the application characteristics of the series resonance with variable inductor and variable frequency in power system were analyzed, and the application of the series resonance with variable inductor and variable frequency in Hubei Xisaishan Power Generation Corporation Limited was expounded.
Application of stator slot coupler method in partial discharge monitoring of generator
CHEN Zhigang;LIN Lingzhi;WANG Leiming
2010, 32(12): 4-6.
Asbtract
(
1431
)
Related Articles
|
Metrics
The composition of the stator slot coupler online monitoring system was introduced. The occurring conditions and the harm of partial discharge of generator were analyzed. Based on this, the monitoring methods of generator partial discharge signal were expounded.The stator slot coupler method is very effective, which is one many monitoring methods of partial discharge signal.
Analysis and treatment on fault of seal oil system of 300MW steam turbine generator set
MA Baohui;NI Tao;ZHANG Xuemin
2010, 32(12): 7-8.
Asbtract
(
1521
)
Related Articles
|
Metrics
The hydrogen purity of the generator in unit No.2 of Huadian Weifang Power Generation Corporation Limited was reduced too fast, the hydrogen exhaust/fillin quantity was larger, the air side DC oil pump often started up in interlock mode. All problems listed above were analyzed. The defects existed in the seal oil system of the generator have been improved, and the problems mentioned above were solved finally.
Analysis on reactive power compensation of highvoltage asynchronous motor
GU Juming;FAN Yongwei
2010, 32(12): 9-11.
Asbtract
(
1578
)
Related Articles
|
Metrics
Using the capacitors connected parallel with threephase asynchronous motor to realize reactive power compensation for raising the total power factor is the widelyused method for increasing the motor operation power factor. Based on the analysis of operation characteristics of highvoltage asynchronous motor in pump station of water conservation project with different load factor, a new method to select the capacity of the capacitor parallel connected with three phase highvoltage asynchronous motor was put forward. Favorable compensation effect of the motor reactive compensation capacity configured by this method was obtained in practical operation.
Analysis on reasons of differential protection action of aircooled generator
CHEN Riguang
2010, 32(12): 12-13.
Asbtract
(
1977
)
Related Articles
|
Metrics
The principle and the cooling system of QFW-6-2 aircooled generator were introduced. The reasons of the faults, which caused the differential protection action two times during the generator debugging period, were analyzed. The relevant measures were adopted, and the generator operation became normal.
研究与开发
Simulation research and application of evolutionary game theory based on Repast
GU Hongchao;HUANG Xian
2010, 32(12): 14-17.
Asbtract
(
1264
)
Related Articles
|
Metrics
The evolutionary game theory is new development of the game theory. It initially arose from biology domain; along with the indepth study, the scientists introduced it into other fields gradually and have unearthed its important significance. There are mainly two methods to research the evolutionary game theory at present, one is analytic method, and another is computerbased simulation method. The Repast is one of the frequentlyused multiagentbased modeling and computer simulation platforms. Using the Repast simulation platform, packet the existed model (copied dynamical equation of state); carry out the simulation study under given conditions; use this method in electricity market to simulate the bidding behavior of the power generation enterprises. During simulation process, the dynamic processes of various power generation enterprises adopting different game strategies were well incarnated by the platform, and finally tended to their own equilibrium. The conclusion obtained by simulation is basically in accord with that obtained by analytic method.
Cold start and optimized combustion adjustment of 330MW subcritical boiler
WANG Chaoyang;DU Jianqiao;ZHOU Ruoming
2010, 32(12): 18-21.
Asbtract
(
1302
)
Related Articles
|
Metrics
The implementation procedure of boiler cold start without oil was introduced. The problems of plasma ignition system and MPS190 coal pulverizing system with medium speed mill occurred in cold state and hot state trail running were analyzed, and relevant treatment methods were given. By the combustion adjustment with load, the highefficient, safe and stable operation of the boiler during trail running period was realized. In whole startup debugging period, some key links were realized, which included the cold start and hot start without oil, the pipe blowing, the load rejecting, the combustion stabilizing in low load and the shutdown with variable parameters; a great amount of fuel oil was saved; and favorable economic and social benefits were obtained.
Design and realization of data mining system for economical operation pattern of thermal power generation units
LI Zongshan;;HUANG Xiaobin
2010, 32(12): 22-25.
Asbtract
(
1177
)
Related Articles
|
Metrics
The application of data mining in thermal power plant was introduced. A data mining algorism based on similarity analysis technology was put forward. On this foundation, the unit economical operation pattern data mining system based on the VS2005 platform and the SQL Server 2005 database was developed. The system structure and functions were analyzed, and the design process of main modules of software system was expounded. The system had been applied in practical production data of power plant successfully, the mining result of unit economical operation pattern was obtained, the incremental mining method was realized, and excellent effects were obtained.
Practice of safety technique management for gantry crane manufacture in hydropower stations
YU Manye;YE Jing;YUAN Jianhua;GU Yanjing
2010, 32(12): 26-28.
Asbtract
(
1777
)
Related Articles
|
Metrics
Combining with the manufacture process of the MQ2000/400 kN bidirectional gantry crane in Sichuan Zipingpu Hydropower Station, the experiences of safety technique management in gantry crane manufacture of hydropower station were introduced, which have referential significance for the implementation of file SL 425—2008 ‘Safety rules of lifting appliances for water resources and electric power construction’.
Variable frequency reformation of condensate pump in 300MW unit for energy conservation
DENG Chaoxu;YAO Zhongdong;ZHANG Mengmeng
2010, 32(12): 29-31.
Asbtract
(
1231
)
Related Articles
|
Metrics
The operation principle of the high voltage frequency converter was introduced. The variable frequency reformation scheme of 300MW unit condensate pump in Yaomeng Power Generation Limited for energy conservation was described, and its operation mode, its control logic and its investment benefit were analyzed, providing a reference for similar units in their high voltage variable frequency reformation.
Application of supercapacitor energy storage technology in distributed power generation system
LIU Wei;KANG Jitao;LI Shan;CUI Junfei
2010, 32(12): 32-33.
Asbtract
(
1124
)
Related Articles
|
Metrics
The basic theory and classification of the supercapacitor energy storage system were introduced. The functions of the energy storage technology in distributed power generation system were analyzed. The basic structure of the supercapacitor energy storage system was expounded. The supercapacitor energy storage system can enhance the energy source utilization rate of distributed generation system and improve the stability, reliability and economic efficiency of distributed power generation system.
Field dynamically balancing technology for rigid rotors of thermal power plant
CAO Jingfang;LI Shengwei
2010, 32(12): 34-36.
Asbtract
(
1300
)
Related Articles
|
Metrics
The concept of rigid rotor and the basis of rigid rotor classification were introduced. The reasons of rotor unbalance fault were analyzed. The classification and characteristics of the unbalance faults were expounded. The method for field dynamically balancing was given. By listing some examples, the experiences of field dynamical balance handling were summarized.
Design features of the new type unloader
CHENG Wenguang;ZHAO Haiyan;WU Junfeng
2010, 32(12): 37-39.
Asbtract
(
1501
)
Related Articles
|
Metrics
The technical parameters, the working principle, the structure features and the electrical control system of the new type unloader were introduced. Comparing with the traditional unloader, the plough tripper and other belt unloading devices, the new type unloader has advantages of accurate allocation, convenient unloading, stable operation, rational structure, good sealability, high efficiency and longer service life. The new type unloader can be widely used in many vocations, such as the industries of electric power, coal, grain, metallurgy, chemical industry, port and the construction materials.
Reformation and optimization for waste heat recovery of rollingcylinder slag cooler in 490t/h CFB heatsupply unit
GUO Zengliang;YUAN Xiongjun
2010, 32(12): 40-43.
Asbtract
(
1306
)
Related Articles
|
Metrics
Three feasible reformation schemes for waste heat utilization of the cylindrical slag cooler in 490 t/h CFB boiler of a power plant were put forward, and their economic efficiencies were analyzed and compared by using the equivalent enthalpy drop method. It is pointed out that the better economic efficiency for waste utilization can be obtained by using the cooling water with temperature as high as possible and its quantity as less as possible. Aiming at the characteristics of the heatsupply unit, a ‘combined switchovertype’ scheme for slag cooler waste utilization was put forward, and the contradiction between the highefficiency and safety of CFB slag cooler waste heat utilization in heatsupply unit was solved effectively.
Using MF+RO+EDI integrated membrane method to produce chemical make up water for power plant
WANG Renlei;LI Hao;HE Caiyan
2010, 32(12): 44-46.
Asbtract
(
1328
)
Related Articles
|
Metrics
In a north waste incineration power plant, the underground water from deep well was treated by MF+RO+EDI integrated membrane method and used as chemical make up water. The design of the system process, the equipments and the operation conditions were introduced, and the problems existing in the system were analyzed. The practice shows that using the MF+RO+EDI technology, the quality of the output water can perfectly accord with the water quality standard of chemical make up water, and the system operates stably and reliably.
技术交流
Influence of bypass control for high and middle pressure main steam of steam turbine on water level in steam drum
WANG Zijin
2010, 32(12): 47-50.
Asbtract
(
1473
)
Related Articles
|
Metrics
The control mode of the steam turbine main steam bypass system of M701F gassteam combined cycle unit manufactured by the Japan Mitsubishi was introduced. Combining with the matched action process of the bypass valve and the main steam control valve during the unit starting up process, the reasons of the fast falling of the water level in middlepressure steam drum were analyzed. The preventive measures and operation proposal were put forward. After adjustment of open speed of the high and middle pressure steam adjusting valve, the fluctuation of the water level in steam drum was decreased effectively, and the unit safe startup and shutdown were ensured.
Analysis on reason of induced draft fan stall of 600MW unit and countermeasures
LIU Tao
2010, 32(12): 51-53.
Asbtract
(
1598
)
Related Articles
|
Metrics
The characteristics and technical parameters of induced draft fan of the boiler with bagtype dust remover in a power plant were introduced. Based on this, the reasons of induced draft fan stall were analyzed. The relevant measures were adopted, and favorable effects were obtained.
Analysis on exergy efficiency of 600MW ultrasupercritical boiler
ZHAO Zhongdong;XUE Qinghong
2010, 32(12): 54-56.
Asbtract
(
1360
)
Related Articles
|
Metrics
Based on the thermodynamic exergy analysis, the mathematical expression of boiler exergy efficiency was established. For a selected condition, the exergy loss and the exergy efficiency of a 600MW ultrasupercritical boiler were calculated. The calculation shows that the exergy analysis method can reflect various losses and their happening position of power plant boiler more comprehensively. In order to tap the potential of energy conservation and to enhance the economical efficiency of the boiler, the measures for decreasing the exergy loss were put forward.
Chemical indepth debugging technology for ultra supercritical units
LU Guohua;FAN Shengping
2010, 32(12): 57-58.
Asbtract
(
1467
)
Related Articles
|
Metrics
According to the technical characteristics of ultra supercritical unit, the debugging process of the chemical system and the site debugging experiences, the chemical indepth debugging technology of newbuilt ultra supercritical unit was expounded considering the optimization of chemical debugging process, the performance test of the chemistry equipments and the adjustment of the chemical operation conditions, to provide technical reference for optimizing the chemical debugging process and enhancing the chemical debugging quality.
Upper air maintenance technology for metal framework of largescale carnage equipment
WANG Shanqiao
2010, 32(12): 59-60.
Asbtract
(
1382
)
Related Articles
|
Metrics
According to the features of major engineering works, implementing upper air maintenance for fracture crack and distortion of largescale tower crane metal structure and other metal structure in the building construction spot is the most effective method for reducing expenses and equipment maintenance time. However, there is safety risk and technical difficulty lying in this method, only the enthusiasm and creativity of the specialized technical personnel is comprehensively performed can the technical difficulty of safety construction of metal structure upper air maintenance be solved. This article puts forward relevant methods and innovative principle advices by cases for the reference of the industrial technical personnel.
Analysis on safety of heating surface in boiler starting up process and control measures for overtemperature prevention
XU Juntao;LIU Zhijie
2010, 32(12): 61-63.
Asbtract
(
1247
)
Related Articles
|
Metrics
Some problems occurred in starting process of the 300MW boiler of Second Electric Power Branch of Henan Zhongfu Industry Corporation Limited, which include larger temperature difference between the drum’s upper wall and lower wall, serious overtemperature of the low temperature overheater, greater fluctuation of the air preheater current. Due to these problems, the control of whole starting time became more difficult, the life of the metal materials were imperiled seriously; and the long ignition time will cause increase of the fuel oil consumption and decrease of generated electricity.In this paper the safety of the heating surface in boiler starting process was analyzed, and the measures for overtemperature prevention were put forward, which were summarized according to many times starting practices.
Application of coal storing technology using paralleling multisquare bunkers in large coalfired power plant
LUO Yudong
2010, 32(12): 64-67.
Asbtract
(
1429
)
Related Articles
|
Metrics
The technical features of the current main coal storing modes in large coalfired power plant were described briefly, and the coal storing technology using paralleling multisquare bunkers was introduced emphatically. Combining with the coal yard extension scheme for 1000 MW units of a power plant in Eastern Guangdong, the technicaleconomical comparison between the paralleling multisquare bunkers mode and other coal storing modes was carried out. The application conditions of coal storing technology using paralleling multisquare bunkers in large coalfired power plant were expounded.
Reformation of backup plate of dumper using hydraulic pressure system
LI Senmin
2010, 32(12): 68-68.
Asbtract
(
1442
)
Related Articles
|
Metrics
There was larger impulsive force in leaning and returning of dumper body in China Huadian Fularji General Power Plant, which can damage the vehicles and the equipment. A reformation scheme was proposed, in which the original fixed dumper backup plate was replaced by removable backup plate, and the plate was driven by hydraulic pressure cylinder. After the reformation, the impulsive force in dumper and returning were eliminated completely, and the equipment operation became more stable.
Analysis on fault of lubrication oil pressure falling in steam turbine and treatment measures
YANG Jianping;YANG Chengqiang;CAO Dinghua
2010, 32(12): 69-70.
Asbtract
(
1670
)
Related Articles
|
Metrics
Aiming at the fault of oil pressure falling in unit No.2 of Baotou Power Generation Branch of Inner Mongolia Huadian Energy Corporation Limited, under the premise of safety of main machine, the lubrication oil system test was carried out to make prejudgment. And after the unit shutdown, the oil system was inspected, and it was found that the power oil inlets of oil ejectors No.1 and No.2 of main machine lubrication oil system of unit No.2 were blocked by foreign bodies. The reason of lubrication oil pressure falling was found, the problem was solved successfully.
节能与环保
Analysis on key technologies of flue gas denitration using selected catalytic reduction method
ZHANG Jie;MA Junbiao;HU Yongfeng;ZHANG Yang
2010, 32(12): 71-74.
Asbtract
(
1574
)
Related Articles
|
Metrics
The present situation of flue gas denitration market of our country was analyzed. The key technologies of SCR denitration process were expounded, which include the selection of ammonia injection device, the simulation experiment of flow field, the design of SCR reactor, the design of denitration gas duct and ash hopper, the selection of catalyst type, the denitration system debug, the operation, maintenance and management of the denitration system. Aiming at the domestic denitration project construction, several suggestions were put forward.
Application of selective catalytic reduction deNOx technology in Guangzhou Zhujiang Power Plant
DUAN Xiaoyun
2010, 32(12): 75-77.
Asbtract
(
1479
)
Related Articles
|
Metrics
Taking the Guangzhou Zhujiang Power Plant as an example, the characteristics of the selective catalytic reduction deNOx technology were introduced; the practical application of the technology was analyzed. It was expected that this paper can provide some references for similar units.
Analysis on chimney operation conditions and anticorrosion reformation scheme
CHEN Jianjun
2010, 32(12): 78-80.
Asbtract
(
1619
)
Related Articles
|
Metrics
The desulphurization technical reformation project of the 2×135MW unit of Zhoukou Longda Power Generation Corporation Limited and the unit chimney were introduced. The chimney operation conditions and the influencing factors were analyzed. The anticorrosion reformation scheme of the chimney was put forward, and the operation regulating measures for the chimney before anticorrosion reformation were given too.
新能源
Method for wind power unit type optimizing selection in wind power plant construction
ZHANG Wenzhong;FAN Wei;LIU Qingchao
2010, 32(12): 81-83.
Asbtract
(
1322
)
Related Articles
|
Metrics
The optimized type selection of wind power unit influences on the income from investment of wind farm significantly. Using the neural network model to estimate its total investment, and carrying out the economical and technical comparison on various kinds of units by using the wind farm life cycle costbenefit model, the optimized unit type selection can be realized. Taking the unit type selection of a wind farm as an example, the optimized method was analyzed and demonstrated, the result shows that the method is feasible and has theoretical and practical values.
Author Center
Online Submission
Citation Format
Copyright Agreement
Template
Author Guidelines
Review Center
Peer Review
Editor Work
Editor-in-Chief
Office Work
Journal Online
Just Accepted
Current Issue
Archive
Most Read Articles
Most Downloaded Articles
Most Cited Articles