综合智慧能源 ›› 2022, Vol. 44 ›› Issue (9): 1-10.doi: 10.3969/j.issn.2097-0706.2022.09.001

• 综合能源系统 •    下一篇

考虑光伏不确定性因素的电力系统概率潮流三点估计法

高明1(), 陈家豪2,*(), 王丽晓1, 唐武琛1, 王智东3, 张紫凡1, 马海霞1, 冯瑞珏1, 周长鹏1   

  1. 1.广州城市理工学院 电气工程学院,广州 510800
    2.宜通世纪物联网研究院(广州)有限公司,广州 510665
    3.华南理工大学 电力学院智慧能源工程技术研究中心,广州 510640
  • 收稿日期:2022-06-20 修回日期:2022-08-30 出版日期:2022-09-25 发布日期:2022-09-26
  • 通讯作者: 陈家豪
  • 作者简介:高明(1978),男,高级工程师,博士,从事综合能源及数字电网研究工作, gaoyugui0508@163.com
  • 基金资助:
    中央高校基本科研业务费成果转化类项目重大产学研合作扶持专项(x2dlD2201310);广州市基础与应用基础研究项目(202102020643)

A three-point probabilistic load flow estimation algorithm for the power system considering photovoltaic uncertainties

GAO Ming1(), CHEN Jiahao2,*(), WANG Lixiao1, TANG Wuchen1, WANG Zhidong3, ZHANG Zifan1, MA Haixia1, FENG Ruijue1, ZHOU Changpeng1   

  1. 1. College of Electrical Engineering of Guangzhou City Institute of Technology,Guangzhou 510800,China
    2. Eastone Century Internet of Things Research Institute(Guangzhou)Company Limited,Guangzhou 510665,China
    3. Research Center of Smart Energy Technology,School of Electric Power,South China University of Technology,Guangzhou 510640,China
  • Received:2022-06-20 Revised:2022-08-30 Online:2022-09-25 Published:2022-09-26
  • Contact: CHEN Jiahao

摘要:

随着可再生能源和可调负荷接入比例的上升,传统电力系统将面临更复杂的不确定性因素。为有效刻画不确定性因素对系统运行的影响,提出基于三点估计法(3PEM)的概率潮流计算方法,首先采用2m+1策略的三点估计概率采样,减少采样时间,结合半不变量和Cornish-Fisher级数展开理论对计及负荷和光伏发电不确定性的电力系统概率潮流进行定量描述。通过IEEE 33节点系统进行验证,以蒙特卡罗法为参照,结果证明该方法的准确性和快速性。进一步研究对比光伏发电接入系统前后对系统概率潮流的影响,结果表明离光伏发电接入点越近,影响越显著。

关键词: 可再生能源, 概率潮流, 三点估计法, 半不变量, Cornish-Fisher级数展开, 光伏

Abstract:

As the access proportions of renewable energy and adjustable load rise,the traditional power system faces increasingly complex uncertainties. In order to effectively describe the influence of uncertain factors on system operation,a probabilistic load flow calculation method based on three-point estimation method(3PEM)is proposed. Firstly,3PEM takes 2m+1 sampling strategy to reduce the sampling time. Combining cumulant method and Cornish-Fisher series,the probabilistic load flow of the power system taking adjustable load and PV uncertainty into considerations is described quantitatively. The method is verified by an IEEE 33 node system. Taking the results obtained from Monte Carlo method as the reference,the proposed method is proved to be accurate and fast. Further study is made on comparing the effects of PV power grid-connection on the probability load flow,and the results show that the closer the PV power connection point is to the power system,the more significant impact is on the power system.

Key words: renewable energy, probabilistic flow, three-point estimation, cumulant, Cornish-Fisher series expansion, PV

中图分类号: